Industrial building - Lamela Chyše

Poor load-bearing capacity – a swamp

Contractor: BENDA TRADE s.r.o.
Client: Marc–SA Building Systems, s.r.o.
Site: Chyše

CONSTRUCTION SPECIFICATION

A floor foundation with an application of WEBFLOOR® patented method. The floor was built on ground with a poor load-bearing capacity –a swamp.

Please contact us for further technical information about this construction.

BENDA Trade - technology awards 2009