Patented method
for foundation engineering
CONSTRUCTION SPECIFICATION
The cellular confinement system (geocell), 200 mm (8 in) deep, was installed on the excavated formation. Subsequently the cells were backfilled with crushed gravel, fraction 0–63 mm, with a dune 100 mm. The bituminous carpet was laid directly on the compacted dune.
Please contact us for further technical information about this construction.