Patented method
for foundation engineering
Railway roadbed on the railway track
Býlnice-Horní Lideč
Contractor: | BENDA TRADE s.r.o. |
---|---|
Client: | UNIGEO a.s. |
Site: | Býlnice-Horní Lideč |
CONSTRUCTION SPECIFICATION
The railway roadbed was designed as redeveloped and rehabilitated on the railway fill according to SŽDC (Railway Infrastructure Administration) S4, Annex 6, point 9.C, TYP3 using the cellular confinement system - CCS (geocell) 200 mm (8 in) deep.
Please contact us for further technical information about this construction.