ČD (Czech Railways), Optimization of the railway track

Ostrava- Petrovice

Contractor: BENDA TRADE s.r.o.
Client: TCHAS spol s r.o.
Site: Ostrava- Petrovice

CONSTRUCTION SPECIFICATION

In the scope of optimization work to the Ostrava – Petrovice u Karviné corridor track, the roadbed was rehabilitated of the track no. 2 between Dětmarovice and Petrovice u Karviné where the grade was of an extremely low load-bearing capacity. The ground was rehabilitated using the cellular confinement system (geocell). This railway track section runs in a cutting, the plain consists of saturated high- plasticity clayey soil.

Please contact us for further technical information about this construction.

BENDA Trade - technology awards 2009